Ring Road
Technical Details:
Total Length | 83.12 km |
Total Width | 65.00 m |
Railway Over Bridges (ROB) | 2 |
Tunnels – 11 | 11 (Total 12.62 km) |
Major Bridges | 17 |
Interchanges | 9 |
Current Project Status:
- Pune-Mumbai Expressway to Pune-Ahmednagar Road connection from Solu Interchange to Vadgaon Shinde (PMC limits) is planned as a priority.
- Phase 1 of Stage 1: Solu Interchange to Nirgudi (INR 884.89 crore including GST) and Phase 2 of Stage 1: Nirgudi to Vadgaon Shinde (INR 310.89 crore including GST) DPR is prepared.
- Stage 1 – Phase 1 & Phase 2: Land acquisition and forest land clearance are in progress.
- Stages 2, 3, 4: Land acquisition proposals for Pune-Ahmednagar Road to Pune-Satara Road have been submitted to the District Collector’s office.
Sr.No. | Description | Length (km) |
---|---|---|
1 | Stage 1 – Solu to Vadgaon Shinde (including forest land) | 4.80 |
2 | PMC transferred length (Vadgaon Shinde to Nagar Road) | 5.70 |
3 | PMRDA Town Planning Scheme (Nagar Road to Satara Road) | 15.08 |
4 | PMC Town Planning Scheme (Nagar Road to Satara Road) | 4.68 |
5 | Integrated Township Plan (ITP) | 1.50 |
6 | PMRDA land acquisition (excluding ITP, PMC & PMRDA Town Planning) | 10.64 |
Total | 42.30 |